|
RENDERING
- slap-dash or setting coat
from 1.300 HUF/sqm
ELEVATION PAINTING
- ground coat, duble elevation painting
from 1.300 HUF/sqm
FOLLOW UP LAGGING ( DRYVIT )
- 8 cm-es coating
from 1.300 HUF/sqm
TILED ROOF REPAIRE
- dissociation, make a new lath
from 1.300 HUF/sqm
- make a new tiles roof
from 1.300 HUF/sqm
- tiles roof repaire
from 1.300 HUF/sqm
WATER GANG REPAIRE
- Cleaning
from 1.300 HUF/m
- Repaire
from 1.300 HUF/m
|
|
PLATING
- dissociation. from 1.300 HUF/sqm
- make a new planting of coating with zink steel sheet
from 1.300 HUF/sqm
TRANSPORT COST
- Transport in Budapest happening once by van. 5.000 Ft
- refuse disposal from 1.300 HUF/stere
EXTRA CHARGE
- If the building contractor buy and transport the building material, you pay 5 % extra charge
BUILD A PROTECTING STAGE - The cost of building, dissociation and keep in the premise
3.700 Ft/day/bit
|