|
|
Facade Renewals with industrial rope access work, or from hanging carriage
- Hotel Gellért SPA facade renewal, restoration 2008.
- KIT Bp. VII. Rózsa u. 4-6. Oktatási központ facade renewal, tinning, roof installation.
- Commerzbank facade renewal, Budapest Belgrád rakpart 2005.
- Országos Kereskedelmi és Hitelbank facade renewal Bp.V.Apáczay Csere János utca.
- Apartmenthouse, Budapest, II.ker. Fillér u. 79. facade renewal
- Apartmenthouse, Budapest, VI.ker. Délibáb u. 22. facade renewal
- Hotel Novotel Facade cleaning and painting 2006.
- Budapest IX.Vaskapu utca 41. Mill’s facade of 6000m2 renewal
|
| |
|
|
|
Follow up Heat Insulation - Firewall Budapest XIII.Bulcsu utca lakópark
- Firewall insulation, Budapest, II. ker. Kisrókus u. 31.
- Bp. XXI. Béke tér 1. Apartments follow up insulation (Dryvit)
- Mount Szabadság TOT hotel 5.000 m2 (Dryvit)
|
| |
|
|
|
Steel Constuction – renewal , corrosion maintenance
- Dunaferr kohó sheet coating and insolation repair. 2.000 m2
- 9.000 m2 warehouse corrosion maintenance.
- Fõvárosi Elektromos Mûvek - 1037 Bp. Kunugunda u.47/a 12.5 ton hoist corrosion maintenance.
- GE POWER Veresegyházi üzemcsarnok – Sheet coating and insolation repair after a storm.
|
| |
|
|
|
Concrete building, Concrete corrosion maintenance
- hanging bride concrete maintenance on a 50 aparment building, in Budapest XI.ker.Lágymányosi utca 26.
- Grain Elevator renewal |
| |
|
|
|
Building cleanings
- A HÉLIA HOTEL facade cleanings.
- A Vámház körúti commercial cenert facade cleaning.
- Innsbruck-ban a CASINO INNSBRUCK steel and glass framework cleaning.
4 Seasons Hotel Budapest Roosevelt square facade cleaning |
|
Alpintechnika referencialista Magasépítés referencialista |